A condo handover inspection in Thailand should be done in writing and before title transfer: you list the defects, sign the acceptance record with reservations, and pay the balance only once the developer has committed to fixing them. After the unit is registered in your name, your negotiating position is much weaker. Below you will find a checklist, the warranty described in the standard contract and the mistakes worth avoiding.

We are an international real estate agency with offices in Thailand and Cambodia. This text is general information based on linked sources, not an assessment of your own contract.

Condo handover inspection: the short answer

  • Inspection is not the same as transfer. First you inspect the unit and log defects, then (after repairs) you transfer title at the Land Office.
  • Leave a time buffer. PropertyScout advises at least 2-3 weeks between inspection and transfer, so there is room for repairs and a second check.
  • Do not accept the unit "without comments" if you can see defects. The Civil and Commercial Code relieves the seller of liability for a defect that was apparent at delivery if the buyer accepted the property without reservation (section 473).
  • The warranty comes from the standard contract form. As described for the Or.Chor. 22 form, it is at least 5 years for the structure and at least 2 years for other parts, with repairs within 30 days of written notice. Check your own contract, because it decides.

What the law and the standard form say (as of 18.11.2026)

Since 4 July 2008 the sale contract for a unit in a new condominium must follow the form prescribed by the minister (section 6/2 of the Condominium Act, form Or.Chor. 22). Terms less favourable to the buyer than the form have no effect, as Thai Law Online describes (page updated 15 November 2026). The key rules:

Topic What the sources say Watch out for
Structural warranty at least 5 years start date: sources differ (condominium registration or ownership registration)
Warranty on other parts at least 2 years same; check the building registration date in the contract
Repairs within 30 days of written notice report defects by email and in writing, with a date
Hidden defect (sections 472-474 CCC) seller is liable for a defect that impairs value or fitness the claim prescribes one year after discovery
Defect visible at handover (section 473) no liability if accepted without reservation always list defects in the record
Late handover withdraw with interest, or a penalty of at least 0.01% of the price per day, capped at 10% on a price of 5,000,000 THB: 500 THB a day (about EUR 13), cap 500,000 THB (about EUR 13,444)

The text of the Civil and Commercial Code provisions (sections 472-474) is in Siam Legal's translation. On the start of the warranty, Siam Legal describes the form as running from registration of ownership, while Thai Law Online says from registration of the condominium. The difference can move the deadline by months, so find that clause in your contract. In the sources we checked, we found no provision giving a buyer a statutory right to withhold part of the price after handover. Any such right would have to come from your contract, and you should decide on using it with a lawyer.

Exchange rate used: NBP table 223/A/NBP/2026 of 17 November 2026, 1 EUR = 37.19 THB.

Handover checklist: water, electrics, tiles, windows, AC, drainage

PropertyScout (article of 12 October 2026, updated 2 November 2026) describes 60 points in six groups. The most important ones:

Area What to check
Water pressure with all taps open at once, clear water, and with all taps closed the meter should not move for 10 minutes
Electrics every socket (including earthing), labelled breakers, a test of the residual current device, and each breaker cutting only its own circuit
Tiles and floors walk the whole floor, tap each tile (a hollow sound can mean poor bedding), check levels
Windows and balcony sliding panels, seals, cracked glass, water tightness (water poured along the sill from outside should not get in)
Air conditioning a stable platform for the compressor, room to release heat, condensate piped to a drain and not onto the balcony floor
Drainage bathroom floor sloping to the drain with no pooling, a bucket-of-water test, a clear balcony drain

An older but practical piece in The Nation (2011) adds: run every air-conditioner for at least 30 minutes, test kitchen and bathroom extraction, keep the floor plan at hand and write down every defect. Take dated photos and describe each defect so that someone who has never been in the unit could find it.

Do not forget what the developer should hand over with the keys: appliance manuals, the building handbook and contact numbers. Look at the common areas too (lift, corridor, pool), because they drive the fees we describe in Bangkok condo common area fees.

When to hire an independent inspector

You can do most checks yourself with ordinary tools. PropertyScout names three cases for hiring a professional: a large unit with complex systems, a unit already showing water ingress, and when you cannot attend in person. Ask for an itemised report with photos.

This advice has an extra reason in Thailand. The Nation notes that handover sign-off by an independent third party is uncommon here, which leaves room for argument about what counts as a defect. We do not quote inspection prices because we have no reliable dated source for them. Ask for a written quote and engagement terms, and choose the inspector without the developer's involvement.

The defect list and holding back money

Three documents that PropertyScout suggests having after the inspection:

  1. A cover sheet with the unit and the parties.
  2. A room-by-room defect schedule, signed by both sides, with your copy.
  3. A unit acceptance certificate signed only after the repairs are done.

Write the re-inspection date into the document. After repairs, also check the areas next to the fixes, because new defects often appear beside them.

On holding back money: in a typical purchase of a new condo you pay the balance on the day of transfer, so the time to press for repairs is before that day. Whether you may withhold a payment depends on your contract, so ask a lawyer before doing it. For transfer costs, see who pays the transfer fee in Thailand, and for the transfer of funds from abroad see the FET form guide.

What to do before you sign the transfer

  • Hold the inspection at least 2-3 weeks earlier and leave time for a second check.
  • Put defects in writing and email them to the developer with a date, because the 30-day repair period runs from written notice.
  • Do not sign the acceptance record without reservations while visible defects remain unrepaired.
  • Find the warranty clause in the contract and the date it starts to run.
  • Go through the seven due diligence steps, including title and the foreign quota.
  • Keep copies of everything: the record, photos and correspondence. A defect claim prescribes one year after discovery.

If you are buying a villa rather than a condo

This text covers a unit in a condominium under the Or.Chor. 22 form. A villa built to order is governed by different rules, because it is a construction contract. The Australian-Thai Chamber of Commerce (text of 15 March 2023) points out that a contractor's liability is limited where the work was accepted without reservation (section 598) and that limitation periods depend on the basis of the claim and can differ greatly. The practical rule is the same: list defects before you accept. Agree the details with a lawyer. For a comparison of projects under construction and finished ones, see Koh Samui: off-plan versus ready villas.

Frequently asked questions

How long is the developer's warranty on a new condo in Thailand?

As described for the Or.Chor. 22 standard contract form, the developer is liable for at least 5 years for the structure and at least 2 years for other parts. Sources differ on when these periods start (condominium registration or ownership registration), so check the clause in your contract.

Can I still report defects after signing the acceptance record?

Only with care. The Civil and Commercial Code relieves the seller of liability for defects visible at delivery if the buyer accepted the property without reservation. So list every defect in the record, and report a hidden defect within one year of discovering it.

Do I have to hire an independent inspector?

No, but it is sensible for a large unit, signs of leaks or when you cannot be there. Ask for a report with photos and choose the inspector yourself, not on the developer's recommendation.

Can I hold back part of the price until repairs are done?

In the sources we checked we found no statutory right to withhold the price after handover. Any such option has to be checked in your contract and discussed with a lawyer before transfer.

Want to buy a new condo and understand the handover rules before you pay a deposit? Contact us and we will show you projects from our offer. See also condos for sale in Phuket and property in Thailand. This is general information, not legal or tax advice. Before you decide, consult an independent lawyer who reads your contract.

Current offers

Related Articles

Enter your details to see the listings

  • Every project and unit
  • Prices, sizes and availability
  • Instant access, no waiting

No spam. Already have access? Enter the same details.

Chat with us